Big day for us! Moving to Hyvinkää!

preparations

To ensure a safe lifting of the building, it was necessary to consolidate a number of vertical supports on which the crane traps laid. The windows had to be sheltered with plywood sheets to avoid damages. (9 am)

lifting

6

For the transportation a low truck was used, it allowed the building fit under the bridges. (11 am)

location on site

The site in Hyvinkää was leveled and the foundation blocks were located on the right positions. (3 pm)

10

11

View pictures after some hours of finishing the exterior and adjusting the terrace. Great day with many impressions and useful knowledge. Couple of important things still need to be done, but seems that the most complicated issues are behind the back. (8 pm)

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s